Table 6 Capacity of installed utilities

From: The impact of the increase in import verification fees on local production capacity of selected medicines in Uganda

Utility

Before June 2017

2020

Percentage increase

No. of units

Capacity

No. of units

Capacity

No. of units (%)

Capacity (%)

Air conditioning (KW)

NA

1950

NA

1230

NA

− 37

Boilers (Tonnes/h)

7

774.7

7

774.7

0

0

Chillers (KW)

8

5193

8

3785

0

− 27

Compressors (CFM)

7

6462

13

10,667

86

65

Electricity (KVA)

6

8280

7

12,025

17

45

Heating ventilation and air conditioning (CFM)

128

36,837

174

393,587

36

968

Reverse osmosis plant (L/h)

5

10,775

6

13,575

20

26

Standby generators (KVA)

8

3145

12

7265

50

131

Total

169

73,416.7

227

435,643.7

34

493